Data Center Cooling Tower Makeup Water Calculator
Estimate evaporative cooling tower evaporation, drift, blowdown, and makeup water from recirculation flow, water temperature range, and cycles of concentration.
Result
Formula
Calculation logicFormula definitions and substituted values.
Estimated evaporation (gpm)
0.00085 * Condenser recirculation flow (gpm) * Condenser water temperature range (°F)
0.00085 * Condenser recirculation flow (gpm) * Condenser water temperature range (°F)Entered drift estimate (gpm)
Condenser recirculation flow (gpm) * Drift fraction of recirculation flow (decimal)
Condenser recirculation flow (gpm) * Drift fraction of recirculation flow (decimal)Estimated blowdown (gpm)
max(0, (Estimated evaporation (gpm) - (Cycles of concentration - 1) * Entered drift estimate (gpm)) / (Cycles of concentration - 1))
max(0, (Estimated evaporation (gpm) - (Cycles of concentration - 1) * Entered drift estimate (gpm)) / (Cycles of concentration - 1))Estimated makeup water (gpm)
Estimated evaporation (gpm) + Entered drift estimate (gpm) + Estimated blowdown (gpm)
Estimated evaporation (gpm) + Entered drift estimate (gpm) + Estimated blowdown (gpm)Annual makeup water (US gal)
Estimated makeup water (gpm) * 60 * Annual operating hours (h)
Estimated makeup water (gpm) * 60 * Annual operating hours (h)Related calculators
Data Center Capacity Growth Calculator
Project future IT load from a current load and an assumed constant annual growth rate.
Open calculatorData Center Cooling Airflow Capacity Calculator
Estimate sensible heat removal from airflow and supply-to-return air temperature difference.
Open calculatorData Center Electrical Capacity Calculator
Estimate facility electrical input capacity from IT load, target PUE, and an explicit reserve fraction.
Open calculatorData Center Electricity and Demand Cost Calculator
Estimate a representative monthly and annual electricity bill from energy, billed demand, and fixed tariff charges.
Open calculator